Piman Patana Customer Lounge

Watch the house grows the way you want

Archive for the ‘Karel’ Category

Now swimming pool for Mr.Karel

Posted by pmptn on 20 January, 2008

On backyard is the pool. pic_0043.jpg

One side is shallow for sit, and other is 1.2 depth for swim.  Concrete is main structure, with ceramic tile later. The filter system is skimmer.

pic_0056.jpg pic_0051.jpg pic_0050.jpg  

Posted in Karel, build | 1 Comment »

Progress for Karel – Inside decorative

Posted by pmptn on 20 January, 2008

Bathroom tile. pic_0033.jpg pic_0035.jpg 

Windows in aluminium. pic_0030.jpg pic_0039.jpg  

Ceiling in pattern. pic_0027.jpg pic_0026.jpg pic_0048.jpg

Stair case in curve. pic_0031.jpg

Posted in Karel, build | Leave a Comment »

We’re working hard for Karel

Posted by pmptn on 20 January, 2008

pic_0044.jpg pic_0021.jpg pic_0020.jpg pic_0019.jpg

Posted in Karel, build | Leave a Comment »

More progress- outside

Posted by pmptn on 20 January, 2008

From the front gate to the garage.

pic_0003.jpg pic_0022.jpg pic_0024.jpg pic_0023.jpg .

Posted in Karel, build | Leave a Comment »

More progress for Karel

Posted by pmptn on 20 January, 2008

And now, the complete is near.   

pic_0062.jpg pic_0060.jpg pic_0006.jpg pic_0008.jpg  pic_0007.jpg pic_0009.jpg pic_0018.jpg pic_0015.jpg pic_0017.jpg pic_0010.jpg  

Posted in Karel, build | Leave a Comment »

Progress of Mr.Karel’s house

Posted by pmptn on 9 January, 2008

The house gets to shape now.  p1170876.jpg p1170879.jpg

The gate and garage is already to roof. picture2-035.jpg picture2-062.jpg picture2-056.jpg 

Inside, the raised ceiling looks nice. picture2-063.jpg 

The pool is formed by block before pouring concrete for nice curve.p1170877.jpg picture2-047.jpg 

Posted in Karel, build | Leave a Comment »

Progress for Mr.Karel

Posted by pmptn on 25 November, 2007

pic_0051.jpg pic_0048.jpg pic_0047.jpg pic_0041.jpgpic_0037.jpg pic_0011.jpg  pic_0010.jpg pic_0004.jpg    

The progress reaches the boundary wall, wall rendering, roof, ceiling on upper floor, floor tile, windows and glass.  This week the work may slow down for the rice harvesting time, nobody works out of the field.

The plan to finish in January is OK. 

Posted in Karel, build, photo | Leave a Comment »

Home Building — Karel

Posted by patana on 12 September, 2007

karel37.gif  karel18.gif  karel1.gif  karel11.gif

กำลังก่อสร้างอยู่ในงวดงานที่ 2 ภาพถ่าย ณ วันที่ 12-9-50

Posted in Karel, build, photo | Leave a Comment »

Posted by patana on 31 August, 2007

  

k.jpg

                

kkk1.jpg

                                             

kk.jpg 

    งวดงานที่ 2 กำลังก่ออิฐ และทำบันได ภาพถ่าย ณ วันที่ 28-8-50

Posted in Karel, build, photo | Leave a Comment »

Update photo for Mr.Karel

Posted by patana on 4 August, 2007

The house concrete structure is nearly finished.  The roof beam will be added, then the roof steel truss.  We will have the roof design as discussed modification.  I think after the roof is on the house will look very nice and big.  After the concrete structure, we will be able to add the structure of the back wall, then the garage and gate.  Swimming pool can be decided later when you come.

p1170032_resize.jpgp1170030_resize.jpgp1170029_resize.jpg

02-08-2007

p1160882_resize.jpg

Posted in Karel, build, photo | Leave a Comment »