One side is shallow for sit, and other is 1.2 depth for swim. Concrete is main structure, with ceramic tile later. The filter system is skimmer.
Now swimming pool for Mr.Karel
Posted by pmptn on 20 January, 2008
Posted in build, Karel | 1 Comment »
Progress for Karel – Inside decorative
Posted by pmptn on 20 January, 2008
Posted in build, Karel | Leave a Comment »
We’re working hard for Karel
Posted by pmptn on 20 January, 2008
Posted in build, Karel | Leave a Comment »
More progress- outside
Posted by pmptn on 20 January, 2008
Posted in build, Karel | Leave a Comment »
More progress for Karel
Posted by pmptn on 20 January, 2008
Posted in build, Karel | Leave a Comment »
Progress of Mr.Karel’s house
Posted by pmptn on 9 January, 2008
The gate and garage is already to roof.
Inside, the raised ceiling looks nice.
The pool is formed by block before pouring concrete for nice curve.
Posted in build, Karel | Leave a Comment »
Complete House of Aroon & Ronny
Posted by pmptn on 27 November, 2007
Finally the house is completed. Unfortunately, the surrounding ground and wall are to come. The retaining wall will be above the nearby level. The front gate will be added with the entrance road.
Posted in Uncategorized | Leave a Comment »
Completed HOME from Piman Patana
Posted by patana on 27 November, 2007
Posted in คุณ อภิสิทธ์, build, design, photo | 1 Comment »
Progress for Mr.Karel
Posted by pmptn on 25 November, 2007
The progress reaches the boundary wall, wall rendering, roof, ceiling on upper floor, floor tile, windows and glass. This week the work may slow down for the rice harvesting time, nobody works out of the field.
The plan to finish in January is OK.
Posted in build, Karel, photo | Leave a Comment »
Progress of house–K.Aroon & Ronald Bright
Posted by patana on 15 October, 2007
Posted in คุณ อรุณ, build, photo | Leave a Comment »